Deemed
Export Benefits only for 111 Mega Power Projects Listed in DoR
Notification List 32A of 49/2012
[DGFT Policy Circular No. 14 dated 4th
February 2013]
Subject:
Clarification on availability of Deemed Export Benefits for supply of goods to
Mega Power Projects.
Paragraph 8.2(f) of Foreign Trade
Policy provides for grant of deemed export benefits to supply of goods required
for setting up any Mega Power Project, as specified in Sl.No.507 of
Notification issued by Department of Revenue (DoR)
bearing No.12/2012-Customs dated 17.03.2012, as amended from time to time.
2. DoR has issued
Notification No.49/2012-Customs dated 10.09.2012, amending entry in Sl.No.507
of DoR Notification No.12/2012-Customs dated
17.03.2012, cited at para 1 above. After this
amendment, clarifications have been sought regarding availability of Deemed
Export Benefits for supply of goods to Mega Power Projects.
3. As per amendment referred in para 2, benefit of zero duty import is available only for
such Mega Power Project, specified in List 32A, appended to Notification No.49/2012-Customs,
so certified by an officer, not below the rank of Joint Secretary to the
Government of India, in the Ministry of Power before 19th day of
July, 2012. Only 111 Mega Power Projects have been included in list 32A of
Notification No.49/2012-Customs dated 10.09.2012. This list is given in
Annexure to this Circular. Accordingly, deemed export benefits will be
available for supply to these 111 projects, subject to the conditions of above
stated DoR Notification, provisions of Foreign Trade
Policy and Handbook of Procedures.
Enclosure: List of 111 projects, as available on List 32A of
Notification No. 49/2012-Customs dated 10.09.2012 (4 pages).
Annexure to Policy Circular No. 14(RE-2012)2009-14 dated 4.2.2013
1 Parbati-II,
Himachal Pradesh - 4x200=800 MW (NHPC)
2 Teesta-
V, Sikkim - 3x170=510 MW (NHPC)
3 Sipat-II,
Chhattisgarh - 2x500=1000 MW (NTPC)
4 Vindhyachal-III,
Madhya Pradesh - 2x500=1000 MW (NTPC)
5 Talcher-II, Orissa - 4x500=2000
MW (NTPC)
6 Rihand-II,
Uttar Pradesh - 2x500=1000 MW (NTPC)
7 Sipat-I,
Chhattisgarh - 3x660=1980 MW (NTPC)
8 Kahalgaon-II
Phase-I & II Bihar - 3x500=1500 MW (NTPC)
9 Barh,
Bihar - 3x660=1980 MW (NTPC)
10 Koldam,
Himachal Pradesh - 4x200=800 MW (NTPC)
11 Tuticorin, Tamil Nadu- 2x500=1000
MW (NLC)
12 Parbati-III,
Himachal Pradesh - 4x130=520 MW (NHPC)
13 Jhanor
Gandhar CCPP-II, Gujarat - 2x650=1300 MW (NTPC)
14 Kawas
CCPP-II, Gujarat - 2x650=1300 MW (NTPC)
15 RGPPL, Maharashtra - 2150 MW
(JV of NTPC/ GAIL/ Govt. of Maharashtra)
16 Tapovan
Vishnugad HEP, Himachal Pradesh - 4x130=520 MW (NTPC)
17 Simhadri-II,
Andhra Pradesh - 2x500=1000 MW (NTPC)
18 Indira Gandhi STPP-JV project,
Haryana - 3x500=1500 MW (NTPC)
19 Bongaigaon,
Assam - 3x250=750 MW (NTPC)
20 Barh-II,
Bihar - 1320 MW (NTPC)
21 Koderma
TPS St-I, Jharkhand 1000 MW (DVC)
22 Durgapur Steel TPS, West
Bengal - 2x500=1000 MW (DVC)
23 Tehri
Pump Storage Project 4x250=1000 MW (THDC)
24 Mauda, Maharashtra 2x500=1000
MW (NTPC)
25 Rihand-
III, Uttar Pradesh - 2 x 500=1000 MW (NTPC)
26 Nabinagar-
JV with Railways, Bihar - 4 x 250=1000 MW (NTPC)
27 Vallur
Stage- I Phase I & II, Tamil Nadu - 3 x 500=1500 MW (NTPC-Tamil Nadu Energy
Co. Ltd.)
28 Raghunathpur
TPS Phase 1, West Bengal - 2 x 600=1200 MW (DVC)
29 Tanda- II, Uttar Pradesh-2 x
660=1320 MW (NTPC)
30 Meja, Uttar Pradesh - 2 x
660=1320 MW (NTPC)
31 Vindhyachal-IV, Madhya Pradesh -
2 x 500=1000 MW (NTPC)
32 Solapur STPP, Maharashtra -
2x660=1320 MW (NTPC)
33 Nabinagar
STPP, JV with Bihar, Bihar-3x660=1980 MW (NTPC)
34 Mouda
STPP-II, Maharashtra- 2x660= 1320 MW (NTPC)
35 Raghunathpur
TPS (Ph-II), West Bengal- 2x660=1320 MW (DVC)
36 North Karanpura
STPP, Jharkhand- 3x660=1980 MW (NTPC)
37 Kudgi
STPP stage-I, Karnataka- 3x800=2400 MW (NTPC)
38 Darlipalli STPP, Stage-I Orissa-
2x800=1600 MW (NTPC)
39 Barethi
STPP, Madhya Pradesh- 6x660=3960 MW (NTPC)
40 Lara STPP, Chhattisgarh
-2x800=1600 MW (NTPC)
41 Gajmara
STPP Stage-I - 2x800= 1600MW (NTPC)
42 Rajiv Gandhi CCPP Stage- II
Phase-I, Kerala- 3x350 =1050 MW (NTPC)
43 Gidderbha
STPP, Punjab - 4x660= 2640 MW (NTPC)
44 Khargone
Super TPP, M.P. - 2x660= 1320 MW (NTPC)
45 Gadarwara
Super TPP, M.P. - 2x660= 1320 MW (NTPC)
46 Katwa
Super TPP, West Bengal - 2x800= 1600 MW (NTPC)
47 Bilhapur
STPP, Uttar Pradesh -2x660= 1320 MW (NTPC)
48 Talcher
STPP Stage-III, Orissa - 2x660=1320 MW (NTPC)
49 Khedar
(Hissar), Haryana - 1000 (+200) MW (HPGCL)
50 Khandwa,
Madhya Pradesh - 2x500= 1000 MW (MPPGCL)
51 Gas based CCPP Pragati-III, Delhi-1371.6 MW (Pragati
Power Corp. Ltd.)
52 Sri Damodaran
Sanjeevaiah, Nellaturu,
Andhra Pradesh - 2x800=1600 MW (APPDCL)
53 Chandrapur
Expansion, Maharashtra- 2x500= 1000 MW (MSPGCL)
54 Koradi
Expansion, Maharashtra- 3x660= 1980 MW (MSPGCL)
55 Bhusawal
Expansion, Maharashtra- 2x500= 1000 MW (MSPGCL)
56 Supercritical TPP at STPS
Stage-V at Suratgarh, Rajasthan- 2x660)= 1320 MW (RRVUNL)
57 Supercritical TPP at Chhabra, Rajasthan - 2x660= 1320 MW (RRVUNL)
58 North Chennai, Tamil
Nadu-2x600=1200 MW (TNEB)
59 Purulia
Pump Storage Hydel Project, West Bengal- 4x225= 900
MW (State Sector)
60 Sagardighi
TPP Ext. Unit 3&4, West Bengal-2x500=1000 MW (WBPDCL)
61 Shree Singaji
TPP-2x660 (MP Power Generating Company Ltd MW (MPPGCL)
62 Krishnapatnam UMPP, Andhra Pradesh- 6x660= 3960 MW (Coastal
Andhra Power Ltd.)
63 Mundra UMPP, Gujarat- 5x800= 4000 MW (Coastal Gujarat Power
Ltd.)
64 Sasan,
Madhya Pradesh- 6x660= 3960 MW (Sasan Power Ltd.)
65 Tilaiya
UMPP, Jharkhand- 5x800= 4000 MW (Jharkhand Integrated Power Ltd.)
66 Orissa UMPP, Orissa- 5x800=
4000 MW
67 Chhattisgarh UMPP,
Chhattisgarh- 5x800= 4000 MW
68 Cheyyur
UMPP,- 5x800= 4000MW
69 Raigarh TPP, Chhattisgarh- 4x250= 1000 MW (M/s. Jindal
Power Ltd.)
70 Akhakhol
GBPP, Gujarat- 3x382.5= 1147.5 MW (M/s. Jindal Power Ltd.)
71 Udupi
(Nagarjuna) Power Project, Karnataka- 2x600= 1200 MW
(M/s. Udupi (Nagarjuna)
Power Corp. Ltd.)
72 IPP project Haryana- 2x660=
1320 MW (M/s. Jhajjar Power Ltd.)
73 726 MW CCGT being developed by
ONGC-Tripura Power Company Ltd. (OTPC) at Palatana,
Tripura-(2x250)(2x113.3)= 726 MW
74 Salaya TPP, Gujarat- 2x600= 1200 MW (M/s. Essar Power Gujarat Ltd.)
75 Tiroda
TPP, Maharashtra-5x660=3300 MW (M/s. Adani Power
Maharashtra Ltd.)
76 Kawai TPP, Rajashtan - 2x660=1320 MW (M/s. Adani
Power Rajasthan Ltd.)
77 Teesta-VI, Sikkim - 4x125= 500 MW
(M/s. Lanco)
78 Teesta-III
Sikkim- 6x200= 1200 MW (M/s. Teesta Urja Ltd.)
79 KSK Mahanadi Power Company Ltd.(U-3 & 4) Janjgir- Champa, Chhathisgarh-2x600=1200 MW (M/s KSK Mahanadi Power
Co Ltd.)
80 Rajpura TPP in the State of Punjab- 2x700= 1400 MW (M/s. Nabha Power Ltd.)
81 Talwandi
Sabo power project at Banawala, Punjab.- 3x660=1980 MW (M/s. Talwandi
Sabo Power Ltd. (TSPL))
82 TPP at Nandgaonpeth,
MIDC, Amravati Dist,.
Maharashtra.- 5x270= 1350 MW (M/s. Indiabulls
Power Ltd.)
83 TPP at Karachhana,
Allahabad, UP- 2x660 = 1320 MW (M/s. Sangam Power Gen
Company Ltd.)
84 TPP at Bara, Allahabad, UP. -3x660=1980 MW (M/s. Prayagraj Power Gen.
Company Ltd.)
85 TPP at Surguja,
Chhattisgarh- 2x660 = 1320 MW (M/s. IFFCO Chhattisgarh Power Ltd.)
86 TPP at Dhenkanal,
Orissa-3x350=1050 MW (M/s. GMR Kamalanga Energy Ltd.)
87 GMR Chhattishgarh
Energy Ltd. Raipur, Chhattisgarh-2x685 MW
88 KSK Mahanadi Power Corporation
Ltd. (U-2&5) Janjgir Champa,
Chhattisgarh-2x600 MW
89 KSK Mahanadi Power Corporation
Ltd. (U-1&6) Janjgir Champa,
Chhattisgarh-2x600 MW
90 Thermal Powertech
Corporation Ltd. Pynampuram Andhra Pradesh- 2x660 MW
91 KVK Neelanchal
Power Pvt. Ltd Cuttak, Orissa-3x350 MW
92 East-Coast Energy Pvt. Ltd Srikakulam, Andhra Pradesh.-2x660 MW
93 Monnet Power Corporation Ltd. Malibrahmani, Orissa-2x525 MW
94 Hinduja
National Power Corporation Ltd. Vishakhapatnam, Andhra Pradesh-2x520 MW
95 Corporate Power Ltd. Chandwa, Jharkhand-4x270 MW
96 Lanco Power Ltd. (U-3,4) Pathadi,
Chhattisgarh-2x660 MW
97 Lalitpur
Power Generation Company Ltd. Lalitpur, U.P.-3x660 MW
98 Lanco
Vidarbha Thermal Power Ltd. Wardha,
Maharashtra-2x660 MW
99 Lanco
Babandh Power Ltd. Dhenkanal,
Orissa-2x660 MW
100 DB Power Ltd. Vadodarha TPP Janjgir Champa Chattisgarh-2x660 MW
101 Athena Chhattisgarh Power Ltd. Singhitarai TPS Janjgir-Champa, Chattisgarh- 2x600 MW
102 Essar
Power Jharkhand Ltd. Tori, Jharkhand- 2x600 MW
103 MB Power (MP) Ltd. Anuppur, Madhya Pradesh-2x600 MW
104 RKM Powergen
Pvt. Ltd. Uchpinde TPP Janjgir-
Champa, Chattisgarh-4x360 MW
105 IL & FS Tamil Nadu Power
Company Ltd. Cuddalore, Tamil Nadu-2x600 MW
106 Meenakshi
Energy Pvt. Ltd Thamminapatanam, Andhra Pradesh-Ph-1:2x 150 Ph-II 2x350 MW
107 SKS Power Generation
(Chhattisgarh) Ltd. Binj Kote
TPP Raigarh, Chhattisgarh-4x300 MW
108 Jindal India Thermal Power Ltd.
Angul, Orissa- 2x600 MW
109 NCC Power Projects Nellore
AP-2x660 MW
110 Samalkot
Power Ltd. Samalkot, Andhra Pradesh-2400 MW
111 Torrent Energy Ltd. Dahej, Gujarat-1200 MW
Note: This is IDENTICAL
to the projects included in List 32A of Notification No.49/2012-Customs dated
10.9.2012