A
Total of 229 plots measuring nearly 1,601 acres have been allotted to companies
with an investment of more than Rs. 18,691 crore in these
04 greenfield smart industrial regions/nodes/areas.
Eight (8) projects under National Industrial
Corridor Development and Implementation Trust (NICDIT) have been sanctioned and
approved by Government. Out of eight Projects for four projects, namely, Dholera Special Investment Region in Gujarat, Shendra Bidkin Industrial Area in
Maharashtra, Integrated Industrial Township in Greater Noida, Uttar Pradesh &
Integrated Industrial Township Vikram Udyogpuri in Madhya
Pradesh, the major trunk infrastructure works have been completed, the Minister of State for Commerce and Industry,
Som Parkash said in reply to a parliamentary question
on 8 February, 2023.
The land allotment has started to industries
and other users through the Special Purpose Vehicles (SPVs) formed with respective
State Governments. A Total of 229 plots measuring nearly 1,601 acres have been allotted
to companies with an investment of more than Rs. 18,691 crore
in these 04 greenfield smart industrial regions/nodes/areas. Apart from the
above-allotted plots, approx. 4,900 acres of developed land parcels are available
for immediate allotment across multiple uses.
The other 04 approved projects are in
various stages of implementation/ development. The status of these projects is given
as below:
i.
Tumakuru Node in Karnataka under Chennai Bengaluru
Industrial Corridor (CBIC)
EPC contractor for the construction of trunk infrastructure has been appointed.
Detailed master planning and preliminary engineering activities for an area of 1,736
acres as an activation area have been completed. Environment Clearance has been
obtained. State Govt. has transferred 1668.30-acre land to the SPV of the project.
The Honble Prime Minister laid the foundation stone on February 06, 2023.
ii.
Krishnapatnam Node in Andhra Pradesh under CBIC Detailed Master Planning and Preliminary
Design & Engineering of the total project area of 12,798 Acre has been completed,
out of which an area of 2,500 Acres has been identified as Phase-1 area. The
State Govt. has transferred 2139.15 acres to the project SPV. Environment Clearance
has been obtained.
iii.
Integrated
Multi Modal Logistics Hub at Nangal Chaudhary in Haryana under Delhi Mumbai Industrial
Corridor (DMIC)
Works related to water, power, and roads are almost completed. Rail connectivity
works approved by DFCCIL have been started.
iv.
Multi-Modal
Logistics/Transport Hub at Dadri in Uttar Pradesh under DMIC 227.48 Ha land has been transferred
to the SPV of the project. Project development activities like preparation and approval
of Detailed Project Reports (DPR) have been started.
The
details of fund allocated to these projects is given below:
|
Sl.No. |
Corridor |
Name of Projects sanctioned |
Funds released to SPVs (in Rs. crore) upto 31.01.2023 |
|
1. |
DMIC: Delhi Mumbai Industrial
Corridor |
Dholera Special Investment Region (DSIR),
Gujarat |
Equity 2784.83 |
|
|
|
Shendra Bidkin
Industrial Area (SBIA), Maharashtra |
Equity 3000.00 |
|
|
|
Integrated Industrial Township
Greater Noida (IIT-GN), Uttar Pradesh |
Equity 617.20 |
|
|
|
Integrated Industrial Township
Vikram Udyogpuri (IIT-VUL), Madhya Pradesh |
Equity 55.93 Debt 260.54 |
|
|
|
Integrated Multi-Modal Logistics
Hub Nangal Chaudhary, Haryana |
Equity 208.05 Debt 100.00 |
|
|
|
Multi Modal Logistics Hub &
Multi Modal Transport Hub (MMLH & MMTH), Uttar Pradesh |
Equity 853.05 |
|
2. |
CBIC, Chennai Bengaluru Industrial
Corridor |
Krishnapatnam Industrial Area, Andhra Pradesh |
Equity 533.86 |
|
|
|
Tumakuru Industrial Area, Karnataka |
Equity 586.74 |