Fastest 5G Rollout
·
Launch
of 2,00,000th 5G Site at Gangotri
·
2,00,000
sites covering 700 districts have been installed in 8 months
·
5G
network has been rolled out in all 28 states and 8 UTs now
·
Dedication
of fibre connectivity to Char Dham
·
Chardhams (Badrinath, Kedarnath, Gangotri,
Yamnotri) are now covered with 5G Mobile Coverage and
have Fibre Connectivity
·
High
Internet Bandwidth for Seamless Access for Pilgrimages Visiting these Char Dhams
·
USA
has Shown Interest for Indian 4G/5G Technology Stack
Prime Minister Narendra Modi
on laying foundation stone of various projects in Mana, Uttarakhand said, “There
are two major pillars of the developed India of the 21st century. First, pride in
our heritage and second, all possible efforts for development and Uttarakhand is
strengthening both these pillars”
In furthering the vision of Prime
Minister and strengthening the pillar of development, Union Minister for Communications,
Railways and Electronics & IT Shri Ashwini Vaishnaw
and Shri Pushkar Singh Dhami, Chief Minister of Uttarakhand
launched 2,00,00th 5G site at Gangotri and dedicated fibre connectivity at Chardham to the Nation at Dehradun in Uttarakhand today. Various
senior officials from the Central and State Government also joined in person and
virtually.
Prime Minister launched the 5G
services on 1st Oct 2022 and within 8 months of launch, 2,00,000 sites covering
700 districts have been installed. 5G network has been rolled out in all 28 states
and 8 UTs now. This is one of the fastest
5G rollouts in the world.
Chardhams (Badrinath,
Kedarnath,Gangotri, Yamnotri) are now covered with 5G Mobile coverage. Most of the
Towers in Chardham yatra route also have now been connected.
Fibre connectivity which supports
extremely high Bandwidth will ensure extremely high internet bandwidth for seamless
access for pilgrims visiting these locations and easing the lives of the public
which is a part of Citizen-centric initiative of the Government. Voice & Video
Call quality in & around temple premises and through the yatra route will henceforth
be very good in spite of high numbers of footfall of Pilgrimages. Further, the entire
trekking path (6 km) from Ghangaria to HemKund Sahib has also been covered with Mobile Services.
Addressing the gathering Ashwini
Vaishnaw said that under the leadership of Prime Minister
Narendra Modi, India is witnessing a Telecom Kranti. The 5G rollout has been one
of the fastest roll out in the world with one site installed per minute. He added
that it’s a matter of pride that 2,00,000th 5G site is commissioned in Gangotri,
CharDham. He also
said that in line with Prime Minister’s vision to lead in the 6G technology development,
India has over 100 patents in 6G technology, which shows the prowess of the talented
engineers and innovators of the country.
He further said, developed countries like USA are showing interest in Indian
4G/5G technology stack. He thanked the Uttarakhand Government for the support and
faster clearances that helped in setting up Telecom services in Uttarakhand at a
very faster pace.
Uttarakhand Chief Minister Pushkar
Singh Dhami thanked the service providers for the support
for commissioning telecom services in the remotest areas of the state. Connectivity
in Chardhams will enable pilgrimages to stay connected
to their kins and world. In Sanchar Kranti remotest villages are also being covered.
He mentioned that Prime Minister said that 3rd decade of 21st century decade would
be Uttarakhand’s decade. He added that India
is leading in technology. He elaborated that high-speed network in Mountains shall
also enable in Disaster Management and surveillance in real time basis. He also
mentioned that 40 per cent of all digital transactions happening in world is in
India. He also said, India is setting global standards in 5G and India has come
out as leader in mobile manufacturing. His address focussed on the key areas like
Device, Digital Connectivity, Data rate and Digital first. He concluded that Centre
and State Government are working in alignment to provide last mile connectivity
to achieve the goal of Antyodaya.
Government of India is working
relentlessly to provide world class connectivity to every remotest village and to
every person in the country.
Various Initiatives for Telecom
Connectivity in Uttarakhand
Ministry of Communications has
put in place multiple programs and newer technologies to extend the reach of a very
strong and affordable communication service even to the remotest corner of this
state, at a fast pace.
Telecom Services today in the
State of Uttarakhand is as under:
·
92.5 per cent of rural population has been covered
with 4G mobile signal (as
on 30.04.2023, the state of Uttarakhand has 1.4 crore Mobile subscribers and 3.2
lakhs wireline subscribers).
·
It is covered by 9,000 towers having 33,000 BTS
·
Many of the Towers have been upgraded to 5G Capacity
in Uttarakhand.
Over the years, the following
Special Programs have been successfully executed in the state of Uttarakhand:
·
354 USOF Scheme 56 Towers have been planned in
Uttarakhand State, out of which 41 sites are made operational, works are in progress
in rest of the sites.
·
4G Saturation Scheme Total 1236 villages are planned
to be covered under the scheme, new towers have been finalized at 360 village locations,
additional 382 villages have also been proposed, and existing towers are being upgraded
to 4G network at 77 locations. Survey is in progress to cover all the villages in
the State with 4G mobile services.
·
Bharatnet Project:
Under its Phase-I Project,
Total Plan was to cover 1849 Gram Panchayats (including BHQs); out
of which 1816 villages/GPs have already been integrated (as on 22/05/2023). The
remaining 33 GPs are now targeted for completion by June 2023.