Sarbananda Sonowal
Inaugurates 74 Crs Oil
Jetty No. 7 at Kandla
·
The jetty will enhance the liquid
handling capacity, by 2.00 MMTPA, of mainly edible oil, and fulfil the future
requirements and will reduced the Turn-around time of the vessels. This
T-shaped Jetty is 110 m long and 12.40 m wide and can handle the large size of
vessel upto 65000 DWT and 14 m depth.
Union Minister for Ports, Shipping and Waterways Sarbananda Sonowal inaugurated and
laid foundation stones of projects worth Rs. 270 crore
at Deendayal Port, Kandla, Gujarat. The Minister inaugurated Oil jetty no. 7 worth
Rs.73.92 crore at Deendayal Port, Kandla in the presence of Shantanu Thakur, MoS, MoPSW, Shripad Naik, MoS, MoPSW
and other senior dignitaries.
The jetty will enhance the liquid handling
capacity, by 2.00 MMTPA, of mainly edible oil, and fulfil the future requirements
and will reduced the Turn-around time of the vessels. This T-shaped Jetty is 110
m long and 12.40 m wide and can handle the large size of vessel upto 65000 DWT and 14 m depth. The project has led to an indirect
employment of around 1000 plus and direct employment of around 250 plus, during
the construction phase.
The foundation stone of three Projects namely Development of back
up area from oil jetty 8 to 11 worth Rs. 98.41 crore; Development of 4 lane road
from LC236B to C.J- 16 worth Rs. 67 crore; Construction
of dome shaped storage shed in cargo jetty worth Rs. 39.66 crore was also laid by
Mr. Sonowal.
During this occasion Sarbananda Sonowal said, ‘these Projects
will enhance Port Infrastructure along with boosting its Logistics performance as
well as the overall Economic Growth for its entire hinterland. They will also improve
the cargo handling capacity of the port along with further improvement in the turnaround
time of the ships and faster evacuation of the cargo’’. He said ‘‘Deendayal Port
is the number one port of the country in terms of cargo handling and through these
projects its capacity will be increased which will be beneficial for the entire
region.’’
Highlights of other Projects
1.
Development of back up area from oil
jetty 8 to 11
·
Addition in the storage capacity of
liquid cargos
·
Fast evacuation of liquid cargo as
back-up area proposed for liquid terminal is behind the Oil Jetty's, hence, reduce
turn-out time
2.
Development of 4 lane road from LC236B
to C.J- 16
·
Better connectivity
·
Reduction in traffic at port
3.
Construction of dome shaped storage
shed in cargo jetty
·
Sheds can provide unobstructed clear
span of 30 m. and height of 9 to 12 m.
·
.Roofing panels are mechanically seamed (Interlocked)
and free from holes, nuts, bolt overlaps and sealants, ensuring almost zero maintenance
·
This structure is upto 50% Economical compared to Conventional Roofing System.
It is to be noted that, Ministry of
Ports, Shipping and Waterways as part of its commitment for the development of Port
Sector in India has identified 74 projects worth Rs. 57,000 Crore under Sagarmala Programme in the state of Gujarat. Out of which, 15
projects worth Rs. 9,000 Crore have been completed; 33 projects worth more than
Rs. 25,000 Crore are under implementation and 26 projects worth Rs. 22,700 Crore
are under development. These projects are being implemented by central line ministries,
major ports, state maritime board and other state agencies.