Varied Measures to Ensure Sustainable Coal Mining
[ABS News Service/13.02.2023]
The best practices adopted by Coal
PSUs for sustainable coal mining are as below:
1. Bio-reclamation / Plantation: Coal PSUs have been making constant
and sincere efforts to minimize the footprints of coal mining through sustained
reclamation and afforestation of areas in and around coal mines. Coal PSUs have
brought about 8,090 Ha by planting about 180.30 lakh saplings from FY 2019-20
to FY 2022-23 (up to January 2023).
2. Development of Eco-Parks: Mining areas, after the exhaustion
of coal reserves, offer good potential for promoting tourism by developing
eco-parks, sites for water sports, golf grounds, avenues for recreation,
adventure, bird watching etc. Over the years, Coal PSUs have developed 30
Eco-parks by undertaking sustainable coal mining practices.
3. Mine Water utilization for community
use: In the process of
coal mining, a huge volume of mine water gets collected in mine sumps and
subsequently pumped out to the surface. By application of appropriate treatment
methods, Coal PSUs are utilizing mine water for community use for
drinking/irrigation purposes. During FY 2021-22, Coal PSUs have supplied 3703
LKL (Lakh Kilo Litre) mine water for community use of which 2712 LKL mine water
was supplied for irrigation purposes and 991 LKL mine water for domestic
purposes benefitting 16.18 lakh people in a total of 871 Villages in coal
bearing States.
4. Gainful Utilization of Overburden
(OB): Even as the mandate is to produce
and despatch coal to its consumers, Coal PSUs have taken an out of box
initiative to produce sand from overburden at a much cheaper price and usages
of processed OB for stowing purposes in underground mines. In this effort, Coal
PSUs have commissioned 4 OB processing plants and 3 OB to sand plants.
5. Promoting Renewables: In order to minimize the carbon
footprints of mining and to progress towards the goal of net zero carbon
emission, Coal PSUs have installed renewables capacity of about 1649 MW (Solar
- 1598 MW and Wind Mills - 51 MW) as of 31.03.2022.
6. Energy Efficient Measures: Coal PSUs have adopted various
energy conservation & efficiency measures such as the use of LED lights,
energy efficient ACs, E-vehicles, Super Fans, Efficient Water Heaters, Auto
timers in street lights, and capacitor banks.
Land reclamation is a continuous
process in coal mining. The reclamation activities after the extraction of coal
are carried out as per the approved Mine Closure Plan (MCP) / Environmental
Clearance conditions which contains detailed provisions with regard to
Progressive as well as Final Mine Closure activities. In the course of mining
operations, mines carry out the Progressive Mine Closure activities
concurrently as per the progressive MCP to mitigate the adverse impacts of
mining at the earliest possible time. The final mine closure activities such as
reclamation are executed as per the approved Final MCP after the cessation of
mining activities in the mine.
Satellite Surveillance Study
undertaken by Coal India Limited in 2021-22 shows that out of the total
excavated area of 76 Open Cast Projects, which are producing more than 5
Million m3 (OB+Coal) annually, 45.01 % area is under back
filling, 17.52 % is biologically reclaimed area and 37.47 % area is under
active mining.
This information was given by Union
Minister of Coal, Mines and Parliamentary Affairs Shri Pralhad Joshi in a
written reply in Rajya Sabha today.